网球场施工所需要的材料

水泥基础(水泥混凝土)
Cement based (concrete)
   网球场质量高低很大程度取决于基础好坏,水泥基础应加入钢筋以增加场地整体性,防止基础开裂。
Tennis court quality depends largely on the basis of quality, should be added in order to increase the cement foundation reinforced site integrity based, to prevent cracking.
  ● 斜度要求
- slope requirements
   水泥地面的斜度误差要求在3‰-5‰以内。如果场地有去水系统(如大规模清洗),则斜度相应增加,并应具备排水地漏或场地排水沟。
Error cement ground requirements within 3 -5%%. If the site has to water system (such as large-scale cleaning), then slope increases accordingly, and should have a floor drain or site drainage.
  ● 膨胀缝
- expansion joint
   在球场基础施工时,需要在球网下,即整个长方形球场中央设15mm膨胀缝横向贯穿整个球场。移去膨胀物,缝口封上专用填缝料,以防冷热温差引起水泥膨胀干裂。
In the course of foundation construction, need in the net, namely the whole rectangular court arranged in the center of the 15mm expansion of transverse throughout the course. Remove expansion, seam sealing on the special sealant, to prevent the hot and cold temperature caused by expansion of dry cement.
  ●干燥要求
- dry
   根据国际标准,网球地面基础竣工后,需28天以上的养护期,以确保地面干燥。
According to the international standard, tennis ground foundation completion, maintenance period of 28 days or more, to ensure that the ground is dry.
  ● 预埋件
- embedded parts
   在基础施工过程中需要为网柱预留固定件,预埋件之间间隔3米。
Based on the construction process will need to reserve the fixed for the net post, embedded parts between the distance of 3 meters.
  ● 去水测试
- to water test
   任何水汪或"鸟澡池"积水深度不得超过一枚硬币,超过处必须用水泥修补平整。
Any water Wang or "depth of accumulated water bird bath" shall not be more than a coin, more than must be repaired and leveled with cement.
B  沥青基础(沥青混凝土)
B asphalt base (asphalt concrete)
   沥青基础应根据当地环境情况,从地面向下挖相应深度,并依次填充不同材质,逐步碾压,密度不低于2.35吨/立方米,表面无麻石、无蜂窝、无油类污染,并在夏季高温时不返油。
Asphalt base should be according to the local environment, excavating down corresponding depth, and in turn filled with different materials, gradually compacted density of not less than 2.35 tons / m3, no surface granite, non cellular, no oil pollution, and in the summer high temperature does not return oil.
  ● 斜度要求
- slope requirements
   沥青地面的斜度误差要求在3‰-5‰以内,应具备排水地漏或场地排水沟。
Error of asphalt ground requirements within 3 of% -5%, should have a floor drain or site drainage.
  ● 沥青的铺设
Laying - Asphalt
   最后的表层必须用高度幼细含砂沥青,用8-10吨碾车压平,使其基础面层稳定平整。
The final surface must be highly fine sand asphalt, used 8-10 tons of crushed cars flattened, the foundation of stable flat surface layer.
  ● 面层要求
Requirements - surface layer
   沥青必须按图铺设,表面平整,无明显蜂窝麻面,平整度用3M直尺量度,误差不能超过3MM。
According to the diagram of asphalt must be laid, smooth surface, no obvious cellular pits, roughness 3M ruler measurement, error cannot be more than 3MM.
  ● 排水系统。
- drainage system.
   球场设计必须考虑设有排水系统。
Golf course design must consider a drainage system.