一、塑胶篮球场施工的测量及调整方案?
A plastic basketball field, construction measurement and adjustment scheme?
(1)、按要求检验地基、处理地基并处理好伸缩逢。
(1), according to the requirements of the inspection foundation, foundation treatment and handling the expansion joint.
(2)、根据设计要求和施工方案中的塑胶使用配比,配置少量的塑胶,进行摊铺试验,以确定施工方案和检验地基的处理情况
(2), according to the requirements of the design and construction scheme of plastic use ratio, small amount of plastic, paving the test, to determine the treatment situation of construction scheme and test foundation
(3)、塑胶球场施工测量温度、湿度等参数并做好记录。
(3), plastic stadium construction measurement of temperature, humidity and other parameters and record.
(4)、画好施工线作好每一天的施工计划。
(4), painted a good construction line for construction plan every day.
(5)、调配塑胶:根据要求按甲乙组分以及定量橡胶颗粒组分按一定比例混合搅拌均匀后,加入催化剂继续搅拌均匀。
(5), the deployment of plastic: according to the requirement of Party A and Party B according to the composition and quantitative rubber particles components according to a certain proportion and through mixing, adding catalyst to stir.
(6)、调整刮平设备的标尺,按要求刮平施工,厚度控制在5.5-6.0mm。
(6), adjust the scraping device according to the requirements of construction scale, scraping, thickness control in 5.5-6.0mm.
二、塑胶篮球场施工检验及处理方式 ?
Two, plastic basketball court construction inspection and treatment method?
(1)、用扎锥和塞尺测量底胶厚度。
(1), using bar cone and a feeler gauge measurement base glue thickness.
(2)、用3米直尺或大杠尺检验底胶的平整度,对于高出部分必须按要求打磨。
(2), with 3 metre ruler or big bar ruler test base glue and flatness for the higher part required grinding.
( 3 )、塑胶球场施工面层铺设 a. 施工步骤
(3), plastic stadium construction surface layer laying A. construction steps
(4)、按要求检验底胶、处理底胶。
(4), according to the requirements of test base gum and processing base glue.
(5)、配置少量的塑胶,进行摊铺试验,以确定施工方案和检验地基的处理情况。
(5), with few plastic paving the test, to determine the treatment situation of construction scheme and test foundation.