球场施工讲解硅PU材料铺设施工前的准备工作

一、硅PU材料铺设前准备工作
A silicon PU material, the preparatory work before laying
1、组织全体铺设人员认真熟悉图纸了解设计意图,解决运动场中技术难点。
1, organize all the laying of personnel seriously familiar with drawings understanding of design intent, to solve the technique problems in the sports field.
2、定专人收录天气预报资料,并与当地气象台站取得信息,掌握整个施工期间当地中短期气象信息,及时调整施工安排,确保硅PU材料装工作的质量,进度不受气候温度空气湿度的影响。
2, scheduled to hand collected weather data, and obtain the information with local meteorological stations, to master the whole construction period in short-term local weather information, timely adjustment of construction arrangement, ensure the quality of silicon PU material is work, affect the progress from climate temperature air humidity.
3、为保证硅PU材料铺设质量及工艺,每个工序除正常配备之外,另配一名质检及复检员。
3, in order to ensure the laying of silicon PU material quality and process, each process in addition to the normal equipped with outside, the other with a quality inspection and verified by.
二、施工前注意事项:
Note two, before construction:
1、硅PU材料搅拌场所须以胶布铺垫,以确保地面整洁,保持环境卫生。
1, PU silicon material stirring place must be with adhesive plaster bedding, to ensure that the floor clean and maintain environmental hygiene.
2、硅PU材料启用时封盖必须先清洁干净。
2, the silicon material is enabled when the PU capping must first clean.
3、聚氨酯硅PU材料使用时应先倒入硬化剂(透明液状)再倒入主剂(彩色液状),倒入搅拌桶时应宜倒入桶中央勿沿桶边顺倒,以免桶边材料不能完全混合均匀。
3, the use of polyurethane silicon PU material should be first into the hardening agent (transparent liquid) and then into the main agent (color liquid), into the stirring barrel should be poured into the barrel along the barrel along the edge of the central not inverted, lest the bucket edge materials can not be completely uniform mixing.
4、搅拌时,搅拌机应上下左右摇动,使材料充份搅拌均匀。
4, stirring, mixer should be up and down about shaking, make the material fully mixing evenly.
5、聚氨酯硅PU材料铺设前以清扫机清理地面上之灰尘及污垢有油渍之处,必须挖除处理。
5, polyurethane silicon PU materials before laying in cleaning machine to clean dust and dirt on the ground with greasy place, must dig treatment.