丙烯酸球场施工的基础要求

水泥混凝土基础,标号不低于C25,厚度不低于150mm,混凝土基础结构中要有防潮层,四周必须有排水沟渠,混凝土表面不能抹光,普通纹理层面最好,根据场地的不同及浇铸素混凝土或钢筋混凝土,应在适量位置切割伸缩缝。水泥混凝土基础完工后须养护期28天后,经冲水处理才后施工丙烯酸材料。
The basis of cement concrete, the label is not less than C25, the thickness of not less than 150mm, concrete foundation structure of moisture-proof layer, all must have drainage ditches, concrete surface can not wipe the light texture, ordinary level best, according to the different sites and casting concrete or reinforced concrete, expansion joints should be cut in the proper position. Cement concrete base shall be valid for 28 days after the completion of maintenance, the water treatment only after the construction of acrylic material.
  丙烯酸球场基础的处理可以从以下三个方面进行进行,这些都要找专业的运动场地施工队伍来处里,因为他们对基础的了解会更加深入细致。
Acrylic stadium based processing can be carried out from the following three aspects, these are for the construction team professional sports venues to deal with, because they know the foundation will be more in-depth and meticulous.
  1、检查基础底面;
1, check the bottom of foundation;
  2、修正基础底面;
2, revised the bottom of foundation;
  3、对水泥地面进行酸洗;
Acid 3, on the cement ground;