首先要列出来的三条基础:沥青基础,水泥基础,水泥石粉基础;
First listed three basis: asphalt, cement, cement stone foundation;
球场施工:http://www.yj0755.com
Golf course construction
沥青强度和延展性好,是较为理想的基础,特别适用北方气候寒冷和温差较大的区域,但造价昂贵。同样水泥度好,经济适用,适合温差较小的区域,但延展性差,水泥石粉工期短、成本低、排水性能好,但耐候性差,容易氧化,造成不平整。
Asphalt strength and good ductility, is the foundation of the ideal, especially for the northern cold weather and the temperature difference between the larger area, but expensive. Also cement degree good, affordable, suitable for small temperature difference area, but low ductility, cement powder short time, low cost, good drainage performance, but poor weather resistance, easily oxidized, cause uneven.
1. 基础施工时使用的各种材料,均要在检验合格后方可用于施工;
1. All kinds of materials used in foundation construction, both in the inspection qualified rear can be used for construction;
2. 基础外观:表面均与坚实无明显压路痕迹,平整无裂缝,无烂边推挤、松散、波浪、麻面,接缝平顺光滑,不得有阻水现象;
2. Basic appearance: no obvious pressure road surface and solid, smooth no cracks, no bad side push, loose, waves, pits, seam smooth smooth, can not have block water phenomenon;
3. 试水时。雨后排水120分钟后,允许存有积水但积水厚度不得大于4mm;
3. When testing the waters. After the rain drainage after 120 minutes, allowing water but the water thickness shall not be greater than 4 mm;
4. 基础竣工后放10*10米的方格网进行复测标高,并算出排水坡度,排坡度大于或等于0.5%且误差小于千分之1.5;
4. Put a 10 * 10 meters after the completion of the basis of reiteration elevation of grid, and calculate the slope drainage, drainage slope is greater than or equal to 0.5% and the error is less than 1.5 per thousand;
5. 稳定层碾压密实度不得小于93%;
5. Stable layer of RCC compaction shall not be less than 93%;
6. 平整度、坡度、场地标高的合格率均要达85%以上;
6. Roughness, slope, ground elevation of the pass rate of more than 85%;
7.
球场施工厚度允许偏差正负10%。
7. The stadium construction thickness deviation of plus or minus 10% allowed.