塑胶跑道种类多,具体可以分为5类,其最快捷方便是就算预制型塑胶跑道。预制型塑胶跑道代表着塑胶跑道的最高品质,是历届奥运会的指定产品。预制成型,现场铺装;防滑耐磨且不掉料。
Plastic runway variety, concrete can be divided into five types, is the most convenient type prefabricated plastic runway. Type prefabricated plastic runway represents the highest quality of plastic runway, is specified products of previous Olympic Games. Prefabricated forming, field survey; Prevent slippery wear-resisting and not to drop.
球场施工:http://www.yj0755.com
Field application
一、塑胶球场施工装料铺面:将搅好的塑胶提运进摊铺机的料箱内,并做好均匀装足。
A construction loading, plastic stadium paving: will get good plastic into paver material box, and make uniform loading.
二、球场施工时应注意箱内出料平行均匀,防止材料向一边移积而使出料口发生稀密不均现象。
Second, when the stadium construction should be paid attention to the discharging parallel uniform, prevent materials transported to one side and use the material mouth thin dense disparity occur.
三、塑胶球场施工中当箱内胶料已输出2/3时,应即添加进胶料,以防断胶空铺。
During the construction of the three, plastic stadium when the rubber in the oven has output 2/3, shall be added to the rubber, in case of broken plastic empty shop.
四、球场施工中,注意尽量避免中间的停顿和空铺,确保施工面不存在搭接处和接口点,局部边角处,因机械无法摊铺的地方,宜用人工拖耙结合刮板铺设补齐。
Four, the stadium construction, pay attention to the pause and empty shop as far as possible to avoid the middle, to ensure the construction surface does not exist on it and the interface point, local edge part, due to mechanical cannot paving, appropriate USES artificial drag rake scraper laid a filling.
五、塑胶球场施工底胶施工固化时间:常温下10-12小时可接触, 24小时后可步行,10-15天为完全固化。
Five, plastic stadium construction glue cure time: 10-12 hours can contact under normal temperature, walking after 24 hours, 10-15 days to fully cure.
六、球场施后的第二天,可上人检查补修,
球场施工经仪器检测,如果出现≥2MM的凹凸处均应用喷胶法补平,个别凸起处可用机械刨平。
Six, the stadium after the second day, but here check the repair, the instrument testing, if there is a 2 mm or spray adhesive method was applied to fill in the concave and convex wherever, individual bulge available mechanical planing.