A、按球场施工进度计划施工属高温季节,道路面层表面混凝土浇捣后 用人工按要求抹平后,再铺上一层湿草包,一层干草包(湿草包应在地 面上浇湿之后然后盖在混凝土面上)在最初三天内每天上午拿掉干草 包,浇湿下面一层草包,晚上覆盖干草包。之后白天拿掉草包,浇水养 护,晚上覆盖二层干草包(白天拿旧草包一定要白天有太阳的时候) 。
A, according to the construction schedule construction in high temperature season, concrete road surface layer is cast with artificial according to the requirements of the smoothing, and then covered with a layer of wet blockhead, a layer of dry straw (wet straw in the ground wet and cover on the surface of concrete) removed the hay pack a day for the first three days. On the afternoon, wet below a layer of straw bales of hay, night coverage. The following day remove the straw, water conservation, night covered with two layers of hay bales (time of day old man must take the day the sun).
如遇雨天应采用塑料布覆盖。球场基层应先采用塑料布覆盖,以保证塑 胶面层施工时的清洁、无污染,然后盖上草包浇水湿润养护。
In case of rain should be covered with plastic sheeting. The court should be covered with plastic base, to ensure that the plastic surface construction, clean, no pollution, and then covered with grass watering moist curing.
B、侧模板待混凝土棱角不受损坏即可拆模。
B, a side template for concrete edges without damage to the removal.